Construction Dust Monitoring in Antrim
Real-time PM&sub10; / PM&sub2;.&sub5; boundary monitoring, Frisbee deposited dust gauges and Trigger Action Plans for Antrim construction and demolition sites. IAQM 2024 framework; designed to discharge Antrim and Newtownabbey Borough Council planning conditions. Chartered consultants covering Northern Ireland.
Construction dust monitoring for Antrim sites
Antrim has a significant construction pipeline across the city, with a steady programme of residential and commercial schemes. Many of these sit within IAQM Medium or High Risk and end up with a real-time dust monitoring requirement as a CEMP discharge condition.
We provide MCERTS-grade real-time PM10 boundary monitoring and Frisbee deposited dust gauges for Antrim construction sites, with Trigger Action Plans written to match Antrim and Newtownabbey Borough Council’s standard discharge expectations.
Air Dust Odour designs, installs and operates real-time PM&sub10; boundary monitoring schemes across Northern Ireland, with monthly compliance reports written to discharge Antrim and Newtownabbey Borough Council dust conditions. Schemes are designed and signed off by Malcolm Pounder CEnv MIAQM, a Chartered Environmentalist and Full Member of the Institute of Air Quality Management.
Our Antrim Construction Dust Monitoring Services
IAQM 2024 framework throughout, MCERTS-grade instruments and reports written to discharge Antrim and Newtownabbey Borough Council conditions.
Real-Time PM&sub10; / PM&sub2;.&sub5; Boundary Monitoring
MCERTS-grade real-time particulate monitors with telemetry, deployed at the Antrim site boundary nearest sensitive receptors. Live 1-minute and 15-minute averages, automatic exceedance alerts, monthly compliance reports against the IAQM and TAP thresholds.
Deposited Dust Gauges (Frisbee / Bergerhoff)
Frisbee gauges per BS 1747-1 / Vaughan & Hall and (where the council specifies them) Bergerhoff gauges per VDI 2119, read weekly or monthly at the agreed Antrim sensitive receptor locations and analysed gravimetrically against the IAQM 200 mg/m²/day threshold.
Trigger Action Plan & CEMP Support
We draft the Trigger Action Plan and the CEMP dust section to match the planning condition wording, agree it with Antrim and Newtownabbey Borough Council, and provide the monitoring backup to discharge the condition.
Demolition-Phase Intensive Monitoring
Higher-density monitoring schemes for Antrim demolition projects — typically 6 to 12 weeks of weekly or fortnightly reporting alongside the real-time PM data, because demolition is the highest-dust phase of most projects.
Antrim & Surrounding Areas
We cover Antrim and the wider Northern Ireland, with no per-mile travel surcharges.
Frequently Asked Questions
When does a Antrim construction project need real-time dust monitoring?
Most Antrim construction projects classified as Medium or High Risk under the IAQM 2014/2024 dust framework end up with a planning condition or Section 106 obligation that requires real-time PM10 boundary monitoring and deposited dust gauges throughout the demolition, earthworks and construction phases. Typical triggers in Antrim include residential schemes of 50+ dwellings, commercial schemes of 10,000+ m², any works close to Antrim Council’s declared AQMAs, and any major demolition. Antrim and Newtownabbey Borough Council typically requires CEMPs and TAPs for Medium and High Risk schemes, with monthly compliance reporting throughout demolition, earthworks and construction.
What does Antrim Antrim and Newtownabbey Borough Council typically require?
Antrim and Newtownabbey Borough Council typically requires the DMP / CEMP dust chapter discharged as a pre-commencement condition. The standard package is a written Dust Management Plan (DMP) or CEMP, a Trigger Action Plan with numerical action levels for PM10 (typically 190 µg/m³ investigation, 250 µg/m³ action, 500 µg/m³ stop-works on a 15-minute rolling average), at least one MCERTS-grade real-time PM10 monitor at the boundary nearest sensitive receptors, deposited dust gauges (Frisbee per Vaughan & Hall) at named sensitive receptor locations, and monthly compliance reports submitted to the council.
What sensitive receptors matter most in Antrim?
Sensitive receptors in Antrim include residential areas, schools, healthcare facilities and ecological designations. Any project within ~100 m of these almost always needs a real-time dust monitoring scheme as a discharge condition.
How quickly can you install a Antrim monitoring scheme?
From a confirmed instruction we can usually install a Antrim monitoring scheme within 10 to 15 working days — faster where a planning deadline or HSE Improvement Notice requires it. The Trigger Action Plan and discharge package are typically drafted in parallel with the procurement and can be submitted to Antrim and Newtownabbey Borough Council as soon as the scheme is live.
How much does construction dust monitoring cost in Antrim?
A typical 12-month single-location real-time PM10 monitoring scheme in Antrim (one MCERTS-grade monitor with met sensor, telemetry, monthly reporting and 24/7 alert handling) starts from around £6,000 to £9,000 plus VAT for the year. A two-location scheme with weekly deposited dust gauge readings adds approximately £4,000 to £6,000 per year. Short-term demolition-phase monitoring (typically 6 to 12 weeks) starts from around £2,500 to £4,500. Travel within Northern Ireland is included in the quoted fee. See our cost guide for related pricing.