Construction Dust Monitoring in Cambridge

Real-time PM&sub10; / PM&sub2;.&sub5; boundary monitoring, Frisbee deposited dust gauges and Trigger Action Plans for Cambridge construction and demolition sites. IAQM 2024 framework; designed to discharge Cambridge City Council planning conditions. Chartered consultants covering East of England.

Construction dust monitoring for Cambridge sites

Cambridge has a significant construction pipeline across the Cambridge Biomedical Campus expansion, the AstraZeneca campus, the Cambridge North development and the constant University estate programme. Many of these sit within IAQM Medium or High Risk and end up with a real-time dust monitoring requirement as a CEMP discharge condition.

We provide MCERTS-grade real-time PM10 boundary monitoring and Frisbee deposited dust gauges for Cambridge construction sites, with Trigger Action Plans written to match Cambridge City Council’s standard discharge expectations.

Air Dust Odour designs, installs and operates real-time PM&sub10; boundary monitoring schemes across East of England, with monthly compliance reports written to discharge Cambridge City Council dust conditions. Schemes are designed and signed off by Malcolm Pounder CEnv MIAQM, a Chartered Environmentalist and Full Member of the Institute of Air Quality Management.

Our Cambridge Construction Dust Monitoring Services

IAQM 2024 framework throughout, MCERTS-grade instruments and reports written to discharge Cambridge City Council conditions.

Real-Time PM&sub10; / PM&sub2;.&sub5; Boundary Monitoring

MCERTS-grade real-time particulate monitors with telemetry, deployed at the Cambridge site boundary nearest sensitive receptors. Live 1-minute and 15-minute averages, automatic exceedance alerts, monthly compliance reports against the IAQM and TAP thresholds.

Deposited Dust Gauges (Frisbee / Bergerhoff)

Frisbee gauges per BS 1747-1 / Vaughan & Hall and (where the council specifies them) Bergerhoff gauges per VDI 2119, read weekly or monthly at the agreed Cambridge sensitive receptor locations and analysed gravimetrically against the IAQM 200 mg/m²/day threshold.

Trigger Action Plan & CEMP Support

We draft the Trigger Action Plan and the CEMP dust section to match the planning condition wording, agree it with Cambridge City Council, and provide the monitoring backup to discharge the condition.

Demolition-Phase Intensive Monitoring

Higher-density monitoring schemes for Cambridge demolition projects — typically 6 to 12 weeks of weekly or fortnightly reporting alongside the real-time PM data, because demolition is the highest-dust phase of most projects.

Cambridge & Surrounding Areas

We cover Cambridge and the wider East of England, with no per-mile travel surcharges.

Cambridge town centre Construction and workplace dust monitoring across central Cambridge.
Cambridge industrial estates Engineering, fabrication and warehousing sites across Cambridge.
Cambridge residential areas Construction monitoring near sensitive residential receptors.
Cambridge business parks Office, light industrial and supply-chain workplaces.
Cambridge suburbs Joineries, kitchen-fitter workshops and light industrial sites.
Cambridge construction sites IAQM Medium/High Risk schemes with planning-condition monitoring.
Cambridge demolition projects Intensive demolition-phase monitoring across the area.
Cambridge surrounding villages Workplace and construction dust monitoring across the wider East of England.

Frequently Asked Questions

When does a Cambridge construction project need real-time dust monitoring?

Most Cambridge construction projects classified as Medium or High Risk under the IAQM 2014/2024 dust framework end up with a planning condition or Section 106 obligation that requires real-time PM10 boundary monitoring and deposited dust gauges throughout the demolition, earthworks and construction phases. Typical triggers in Cambridge include residential schemes of 50+ dwellings, commercial schemes of 10,000+ m², any works close to the Cambridge AQMA, and any major demolition. Cambridge City Council typically requires CEMPs and TAPs for Medium and High Risk schemes, with monthly compliance reporting throughout demolition, earthworks and construction.

What does Cambridge Cambridge City Council typically require?

Cambridge City Council typically requires the DMP / CEMP dust chapter discharged as a pre-commencement condition. The standard package is a written Dust Management Plan (DMP) or CEMP, a Trigger Action Plan with numerical action levels for PM10 (typically 190 µg/m³ investigation, 250 µg/m³ action, 500 µg/m³ stop-works on a 15-minute rolling average), at least one MCERTS-grade real-time PM10 monitor at the boundary nearest sensitive receptors, deposited dust gauges (Frisbee per Vaughan & Hall) at named sensitive receptor locations, and monthly compliance reports submitted to the council.

What sensitive receptors matter most in Cambridge?

Sensitive receptors include residential areas across the city, Addenbrooke’s Hospital, the University of Cambridge and Anglia Ruskin, multiple schools and the historic city centre conservation area.

How quickly can you install a Cambridge monitoring scheme?

From a confirmed instruction we can usually install a Cambridge monitoring scheme within 10 to 15 working days — faster where a planning deadline or HSE Improvement Notice requires it. The Trigger Action Plan and discharge package are typically drafted in parallel with the procurement and can be submitted to Cambridge City Council as soon as the scheme is live.

How much does construction dust monitoring cost in Cambridge?

A typical 12-month single-location real-time PM10 monitoring scheme in Cambridge (one MCERTS-grade monitor with met sensor, telemetry, monthly reporting and 24/7 alert handling) starts from around £6,000 to £9,000 plus VAT for the year. A two-location scheme with weekly deposited dust gauge readings adds approximately £4,000 to £6,000 per year. Short-term demolition-phase monitoring (typically 6 to 12 weeks) starts from around £2,500 to £4,500. Travel within East of England is included in the quoted fee. See our cost guide for related pricing.

Need construction dust monitoring in Cambridge?

Send us the planning condition wording (or just the project size, sensitive receptors and start date) — we'll send back a fixed-fee scheme proposal within 24 hours.

Get a Free Quote WhatsApp