Construction Dust Monitoring in Reading

Real-time PM&sub10; / PM&sub2;.&sub5; boundary monitoring, Frisbee deposited dust gauges and Trigger Action Plans for Reading construction and demolition sites. IAQM 2024 framework; designed to discharge Reading Borough Council planning conditions. Chartered consultants covering Berkshire.

Construction dust monitoring for Reading sites

Reading has a significant construction pipeline across the Station Hill regeneration, the Reading Gateway, the Green Park expansion and the constant residential pipeline. Many of these sit within IAQM Medium or High Risk and end up with a real-time dust monitoring requirement as a CEMP discharge condition.

We provide MCERTS-grade real-time PM10 boundary monitoring and Frisbee deposited dust gauges for Reading construction sites, with Trigger Action Plans written to match Reading Borough Council’s standard discharge expectations.

Air Dust Odour designs, installs and operates real-time PM&sub10; boundary monitoring schemes across Berkshire, with monthly compliance reports written to discharge Reading Borough Council dust conditions. Schemes are designed and signed off by Malcolm Pounder CEnv MIAQM, a Chartered Environmentalist and Full Member of the Institute of Air Quality Management.

Our Reading Construction Dust Monitoring Services

IAQM 2024 framework throughout, MCERTS-grade instruments and reports written to discharge Reading Borough Council conditions.

Real-Time PM&sub10; / PM&sub2;.&sub5; Boundary Monitoring

MCERTS-grade real-time particulate monitors with telemetry, deployed at the Reading site boundary nearest sensitive receptors. Live 1-minute and 15-minute averages, automatic exceedance alerts, monthly compliance reports against the IAQM and TAP thresholds.

Deposited Dust Gauges (Frisbee / Bergerhoff)

Frisbee gauges per BS 1747-1 / Vaughan & Hall and (where the council specifies them) Bergerhoff gauges per VDI 2119, read weekly or monthly at the agreed Reading sensitive receptor locations and analysed gravimetrically against the IAQM 200 mg/m²/day threshold.

Trigger Action Plan & CEMP Support

We draft the Trigger Action Plan and the CEMP dust section to match the planning condition wording, agree it with Reading Borough Council, and provide the monitoring backup to discharge the condition.

Demolition-Phase Intensive Monitoring

Higher-density monitoring schemes for Reading demolition projects — typically 6 to 12 weeks of weekly or fortnightly reporting alongside the real-time PM data, because demolition is the highest-dust phase of most projects.

Reading & Surrounding Areas

We cover Reading and the wider Berkshire, with no per-mile travel surcharges.

Reading town centre Construction and workplace dust monitoring across central Reading.
Reading industrial estates Engineering, fabrication and warehousing sites across Reading.
Reading residential areas Construction monitoring near sensitive residential receptors.
Reading business parks Office, light industrial and supply-chain workplaces.
Reading suburbs Joineries, kitchen-fitter workshops and light industrial sites.
Reading construction sites IAQM Medium/High Risk schemes with planning-condition monitoring.
Reading demolition projects Intensive demolition-phase monitoring across the area.
Reading surrounding villages Workplace and construction dust monitoring across the wider Berkshire.

Frequently Asked Questions

When does a Reading construction project need real-time dust monitoring?

Most Reading construction projects classified as Medium or High Risk under the IAQM 2014/2024 dust framework end up with a planning condition or Section 106 obligation that requires real-time PM10 boundary monitoring and deposited dust gauges throughout the demolition, earthworks and construction phases. Typical triggers in Reading include residential schemes of 50+ dwellings, commercial schemes of 10,000+ m², any works close to the Reading AQMA, and any major demolition. Reading Borough Council typically requires CEMPs and TAPs for Medium and High Risk schemes, with monthly compliance reporting throughout demolition, earthworks and construction.

What does Reading Reading Borough Council typically require?

Reading Borough Council typically requires the DMP / CEMP dust chapter discharged as a pre-commencement condition. The standard package is a written Dust Management Plan (DMP) or CEMP, a Trigger Action Plan with numerical action levels for PM10 (typically 190 µg/m³ investigation, 250 µg/m³ action, 500 µg/m³ stop-works on a 15-minute rolling average), at least one MCERTS-grade real-time PM10 monitor at the boundary nearest sensitive receptors, deposited dust gauges (Frisbee per Vaughan & Hall) at named sensitive receptor locations, and monthly compliance reports submitted to the council.

What sensitive receptors matter most in Reading?

Sensitive receptors include residential areas across the town, the Royal Berkshire Hospital, the University of Reading, multiple schools and ecological receptors along the Thames and Kennet.

How quickly can you install a Reading monitoring scheme?

From a confirmed instruction we can usually install a Reading monitoring scheme within 10 to 15 working days — faster where a planning deadline or HSE Improvement Notice requires it. The Trigger Action Plan and discharge package are typically drafted in parallel with the procurement and can be submitted to Reading Borough Council as soon as the scheme is live.

How much does construction dust monitoring cost in Reading?

A typical 12-month single-location real-time PM10 monitoring scheme in Reading (one MCERTS-grade monitor with met sensor, telemetry, monthly reporting and 24/7 alert handling) starts from around £6,000 to £9,000 plus VAT for the year. A two-location scheme with weekly deposited dust gauge readings adds approximately £4,000 to £6,000 per year. Short-term demolition-phase monitoring (typically 6 to 12 weeks) starts from around £2,500 to £4,500. Travel within Berkshire is included in the quoted fee. See our cost guide for related pricing.

Need construction dust monitoring in Reading?

Send us the planning condition wording (or just the project size, sensitive receptors and start date) — we'll send back a fixed-fee scheme proposal within 24 hours.

Get a Free Quote WhatsApp